Off Loading and Handling
Content
- Health and Safety
- Cautionary Notes
- Delivery
- Off Loading Handling & Erection
- Installation
- Commissioning and Testing
- Maintenance
of equipment
held in storage conditions
for a period of up to 2 years - Fan section
- Fan Maintenance
- Electric Motors
- Drive Belts
- Belt Tensioning Instructions
- Electric Air Heater Batteries
- Heating and Cooling Coils
- Recuperators
- Dampers
- Air Filters
- Maintenance Schedule
- Invalidation of Guarantee
Each assembly is only to be lifted at the four (4) points when provided on the channel base. For smaller units nylon straps of the correct capacity should be used. Spreaders must be used to prevent any damage when lifting using slings or lifting points.
Erection of Unit
Before mounting unit in position it is advisable that consideration is given to the access requirements of the unit, particularly with reference to the following:
That provision is made in the plant room or wherever the unit is to be installed for access to remove the following components:
Fans
Electric Heater Batteries
Filters (bags or panels)
Coils and Pipework
Access space is also essential for service and maintenance purposes, and for the removal of the motor(s).