Operating and Maintenance Manual
Commissioning and Testing
Content
- Health and Safety
- Cautionary Notes
- Delivery
- Off Loading Handling & Erection
- Installation
- Commissioning and Testing
- Maintenance
of equipment
held in storage conditions
for a period of up to 2 years - Fan section
- Fan Maintenance
- Electric Motors
- Drive Belts
- Belt Tensioning Instructions
- Electric Air Heater Batteries
- Heating and Cooling Coils
- Recuperators
- Dampers
- Air Filters
- Maintenance Schedule
- Invalidation of Guarantee
All units should be commissioned before initial operation by the contractors appointed engineer. Pre-start checks are required in accordance with recommendations laid down in these instructions. After completion of commissioning all bolts should be tightened and drives checked for alignment and tension.