Operating and Maintenance Manual
Installation
Content
- Health and Safety
- Cautionary Notes
- Delivery
- Off Loading Handling & Erection
- Installation
- Commissioning and Testing
- Maintenance
of equipment
held in storage conditions
for a period of up to 2 years - Fan section
- Fan Maintenance
- Electric Motors
- Drive Belts
- Belt Tensioning Instructions
- Electric Air Heater Batteries
- Heating and Cooling Coils
- Recuperators
- Dampers
- Air Filters
- Maintenance Schedule
- Invalidation of Guarantee
All units must be installed in accordance with good engineering standards, upright and levels on a prepared base. It is not necessary to bolt down the unit. Flexible connections are NOT recommended for connecting ductwork to the unit, as the fan outlet is fitted with a flexible connector, and is isolated from the unit via anti-vibration mounts.
Provision must be made for a cleanable drain trap, which should terminate at an open drain or tundish which will ensure any blockage can be seen and remedied. Units that are delivered in sections should be carefully checked with the general arrangement drawings to ensure erection in the correct sequence and handing. The sections would be bolted together using the nuts, bolts and sealant provided.
Electrical Installation
Site wiring must not penetrate or restrict
opening or removal of access panels.